One vision.
A considered investment.
Allocate each category across three treatments.
Adjust the area mix in 5% steps.
See one complete project budget.
Five categories. One budget.
Choose how much of each category receives each treatment. Drag any slider or type its percentage. Set Basic first, then Standard; Enhanced Standard receives the remainder. Standard and Enhanced share the area left after Basic. Total: 100%. Presets use exact DWG quantities; manual changes use 5% steps. Select a category to view its map, render and isometric.
Area-weighted investment across the three road categories.
Keep a record of your decisions.
Save a project file to retain all values and the proposal library.
Calculation & scope
Each category budget box follows its own largest treatment percentage. The overall project budget follows the treatment with the largest combined allocated area across the three road categories. Civic Spaces and parks do not change this treatment classification; ties use a neutral colour. Budgets use AED. M means million and Bil means billion.
Road cost = length × effective treated width × [(Basic % × Basic rate) + (Standard % × Standard rate) + (Enhanced Standard % × Enhanced Standard rate)] / 100. The three sliders represent Basic, Standard and Enhanced area shares. Basic has first priority. Changing Basic keeps Standard where possible, reducing it only if it exceeds the remaining area. Standard then takes its chosen share of the remaining area; Enhanced receives the balance. Editing Enhanced instead adjusts Standard within the area remaining after Basic. Standard and Enhanced cannot exceed 100% minus Basic. All changes use 5% steps and total 100%. Every treatment with a non-zero share appears in the comparison views.
Fixed B / S / ES rates (AED/m²): Streets 300 / 400 / 500; Avenues 700 / 1,050 / 1,400; Boulevards 700 / 1,400 / 1,800; Civic Spaces: fixed AED 2,100/m² when included. Road lengths and treatment areas are fixed. Parks: three independent phases, each at AED 950 or 1,300/m². Civic and park overlaps are separate work packages and both costs are included.
Older two-handle projects are converted using the colour boundary positions, rounded to 5%; the previous A/B area split is replaced and totals are recalculated. Save a new project file to retain this calculation model.
Half-street plans and 3D models are a display choice only: full budget areas are retained. Civic Spaces use the measured highlighted plots, with an include/exclude checkbox.
Planning allowances only. No additional contingency, fees, VAT or escalation is added.